Thursday, October 29, 2009
Friday, October 23, 2009
Energy Audit 1
Today I had an energy audit done on the house. The photos show the blower door rig which lowers the pressure in the house relative to outside pressure (meter reading show is -20.5 kpa relative to outside) by blowing air out the door. This creates a differential that draws air in through all the leaks or holes in the house.
In order to be eligible for any of the federal or provincial grants that are available right now, you need to have an audit done before and after you make any changes to the house. I'm pretty sure we're going to get a pretty low score on the audit, which means we'll be eligible for a lot of the rebates available, but we shouldn't get attached to any of the windows or walls since they'll be gone as soon as we can afford to replace them.
Thursday, October 22, 2009
Project #1 - shower
Wednesday, October 21, 2009
Closing
We Closed the deal! I picked up the keys today and we quickly went to the house to check it out. Stay tuned for more - as is - photos. Energy audit is scheduled for friday, then on to electrical!
This photo is taken on our sweet linoleum flooring in the kitchen. i learned today that it was applied over cardboard on top of the wooden subfloor. cardboard.
Saturday, October 17, 2009
578 Logan Avenue, Toronto
Subscribe to:
Posts (Atom)